Industries
Roofing: build what the homeowner approved
One job, every record in one place
Ready for production means ready
01
Approved version
Signed, and still current
If the estimate changed after the signature, the job goes back for approval before anything is ordered.
02
Order matches scope
Line by line
Quantities, materials and colours compared with what the homeowner approved. A mismatch goes to the coordinator.
03
Photos on the job
Before, during, after
Inspection and completion photos filed against the job, not on someone's phone.
04
Crew and materials lined up
A date you can keep
Delivery and crew booked together, so the homeowner isn't told a date the yard can't meet.
05
Homeowner kept informed
Without chasing
Updates from the job's real status: materials ordered, date confirmed, crew on the way, work complete.
Fixing it on the roof, or catching it in the office
How it slips today
- 01Revisions saved as new files, approvals by text
- 02Orders typed from whichever estimate was open
- 03Crew dates promised before materials are confirmed
- 04Photos on the estimator's phone
You find out on the roof, with the crew standing around.
With the handoff built in
- 01Every version kept, approval tied to one
- 02Orders checked against the approved scope
- 03A job scheduled only when it's actually ready
- 04Every photo filed against the job
Mistakes get caught at a desk, where they're cheap.
What we'd build for a roofing contractor
- Proposal & Quote AutomationEstimates built from the measured scope, with every revision tracked.
- Approval ReviewApprovals tied to the exact version, with reminders until they're signed.
- Project OperationsFrom approval to close-out, with a readiness check before every crew date.
- Document ProcessingMeasurement reports and supplier paperwork read into the job automatically.
A good fit if revisions and orders keep crossing
Good fit
- Estimates get revised after inspection and the wrong version sometimes gets ordered.
- Crew days are lost to short or wrong deliveries.
- Approvals arrive by text, email and paper.
Not the right fit yet
- You run a handful of jobs a month and one person handles every one end to end.
- You want help winning insurance claims. That isn't what we build.
Questions roofing contractors ask
Do we have to change the roofing software we use?
Usually not. We connect to the estimating and job tools you have and add the checks and handoffs around them.
Can it handle insurance and storm work?
It can keep every document and approval for a job in order. It won't predict or promise a claim outcome; those decisions stay with you and the insurer.
What happens when a homeowner changes their mind after signing?
The estimate gets a new version and the job goes back for approval. Nothing is ordered against a version the homeowner didn't sign.
Does this replace our production coordinator?
No. It gives them every mismatch to decide on, before it becomes a problem on site.
Stop paying for mistakes on the roof
Walk us through one job from inspection to close-out. We'll show you where the old numbers survive, and how we'd catch them.