Harbor Point Condos · 18 Harbor Way
for W1 · prepared Oct 22
- The building has 48 units and was built in 1987 [1].
- Its heating runs on two Aldmark CB-800 boilers, installed in 2018 under permit B-18-0412 [2][3].
- The manufacturer requires annual service to keep the boiler warranty [4].
To settle on the site visit
- Hot water: the 2024 listing says in-unit heaters [5]; a 2021 board newsletter says central [6].
- Who services the boilers now: not found in any approved source.